_________________________________________________________________________
Beaver Lake Top Flood Pool: 1130.0
White River Top Power Pool: 1120.4
(BVGA4) Bottom Power Pool: 1077.0
Turbine
Time Elevation Tailwater Release Generation
Date CS/CDT (ft-msl) (ft-msl) (cfs) (mwh)
__________________________________________________________________________
08FEB2012 0400 1120.88 916.35 20 0
08FEB2012 0500 1120.89 916.35 20 0
08FEB2012 0600 1121.00 919.83 407 6
08FEB2012 0700 1120.88 924.87 7669 110
08FEB2012 0800 1120.88 925.41 7738 110
08FEB2012 0900 1120.84 925.51 7808 111
08FEB2012 1000 1120.84 925.68 7814 110
08FEB2012 1100 1120.81 925.65 7797 110
08FEB2012 1200 1120.75 925.66 7801 111
08FEB2012 1300 1120.79 925.51 7752 109
08FEB2012 1400 1120.75 922.69 4043 56
08FEB2012 1500 1120.72 922.38 3869 54
08FEB2012 1600 1120.73 922.33 3873 54
08FEB2012 1700 1120.78 922.31 3858 55
08FEB2012 1800 1120.74 922.36 3869 54
08FEB2012 1900 1120.78 922.30 3915 56
08FEB2012 2000 1120.77 922.53 4093 58
08FEB2012 2100 1120.70 922.49 4080 58
08FEB2012 2200 1120.71 922.49 4084 58
08FEB2012 2300 1120.70 922.37 4048 58
08FEB2012 2400 1120.71 918.47 162 1
09FEB2012 0100 1120.72 917.10 20 0
09FEB2012 0200 1120.72 916.49 20 0
09FEB2012 0300 1120.70 916.36 20 0
09FEB2012 0400 1120.73 916.35 20 0
09FEB2012 0500 1120.72 917.76 154 2
09FEB2012 0600 1120.67 922.32 3939 57
09FEB2012 0700 1120.63 925.20 7673 110
09FEB2012 0800 1120.69 925.57 7752 110
09FEB2012 0900 1120.72 925.63 7748 111
09FEB2012 1000 1120.72 925.56 7740 110
09FEB2012 1100 1120.65 922.68 4058 57
09FEB2012 1200 1120.66 922.35 3809 55
09FEB2012 1300 1120.66 918.47 128 1
09FEB2012 1400 1120.64 917.09 20 0
09FEB2012 1500 ---- ---- 20 0
--------------------------------------------------------------------------