River and Stream Report for:14 AUG 2018 at 22:31
 
------------------------------------------------------------------------------
Arkansas River Projects
------------------------------------------------------------------------------
                       Date  Time   Headwater Tailwater|| Date  Time    Flows
                                     (feet)     (feet) ||               (cfs)
-------------------------------------------------------||----------------------
Trimble       L&D 13  14 AUG 21:00    392.00    372.28 ||14 AUG 21:00   15,334
Ozark         L&D 12  14 AUG 21:00    371.98    338.33 ||
Dardanelle    L&D 10  14 AUG 21:00    337.86    286.36 ||
Ormond        L&D 09  14 AUG 21:00    285.76    266.12 ||
Toad Suck     L&D 08  14 AUG 21:00    265.17           ||
Murray        L&D 07  14 AUG 21:00    249.14    231.24 ||14 AUG 21:00   23,308
Terry         L&D 06  14 AUG 21:00    230.89    214.04 ||14 AUG 22:31
              L&D 05  14 AUG 21:00    213.70    196.27 ||
Sanders       L&D 04  14 AUG 21:00    196.22    182.76 ||
Hardin        L&D 03  14 AUG 21:00    182.16    164.96 ||
Mills         Dam 02  14 AUG 21:00    162.83    127.81 ||14 AUG 21:00   24,091
Norrell      Lock 01  14 AUG 21:00              123.48 ||
Montgomery Pt L&D     14 AUG 21:00    122.58    122.39 ||
 
---------------------------------------------------------------------------------
Arkansas River tributaries                     Date  Time    Stage   24hr change
                                                             (feet)     (feet)
---------------------------------------------------------------------------------
   Illinois River at Watts, OK                14 AUG 21:00     .94        .51
   Lee Creek near Short, OK                   14 AUG 21:00    1.54        .25
   Frog Bayou at Rudy, AR                     14 AUG 21:00    -.81        .81
   Mullberry River at Mullberry, AR           14 AUG 21:00    2.19        .92
   Spadra Creek at Clarksville, AR            14 AUG 21:00    3.83       1.75
   Little Piney Creek near Lamar, AR          14 AUG 21:00    3.38       1.23
   Big Piney Creek at Highway 164 Bridge, AR  14 AUG 21:00     .55        .56
   Illinois Bayou near Scottsville, AR        14 AUG 21:00    5.45        .31
   Petit Jean River at Danville, AR           14 AUG 21:00   10.06        .35
   Point Remove Creek near Hattieville, AR    14 AUG 21:00    2.75        .21
   Cadron Creek near Guy, AR                  14 AUG 21:00    1.26        .33
   Fourche La Fave River at Houston, AR       14 AUG 21:00    9.09        .19
 
------------------------------------------------------------------------------
White River tributaries                        Date  Time    Stage
                                                             (feet)
------------------------------------------------------------------------------
   Middle Fork of Little Red River at Shirley 14 AUG 21:00    5.29
   War Eagle Creek at Hindsville              14 AUG 21:00    1.08
   Kings River at Berryville                  14 AUG 21:00    3.22
 
------------------------------------------------------------------------------
Cossatot River
------------------------------------------------------------------------------
   Gillham Lake average inflow for 13 AUG was  666 cfs
   Gillham Lake release at 14 AUG 7:00  was   57 cfs
 
 
           For river stages (White and Arkansas Rivers)
             reported by the National Weather Service,
    as well as the most current river stage forecasts go to:
 
               http://www.srh.noaa.gov/lzk/
 
 
           For Buffalo River stages and floating conditions
              reported by the National Park Service
               call (870) 741-5443, or go to:
 
              http://www.nps.gov/buff/hydrosystem.htm
 
 
For floating conditions on the upper reaches of the Ouachita River
above Blakley Dam, contact the U.S. Forest Service at 870-326-4322 or
the U.S. Army Corps of Engineers Vicksburg District Office at
601-631-5672.