James W. Trimble Lock & Dam (L&D 13) Top Navigation Pool: 392.0
Arkansas River (BARA4) Bottom Navigation Pool: 389.0
ATTENTION: Automated river flow calculations for James W. Trimble (L&D 13) may be
inaccurate due to inoperable gauge instrumentation. Water Management
personnel are manually updating river flows at periodic intervals.
Arkansas River at Van Buren   Ozark-Jetta Taylor L&D
Turbine Spillway Total
Time Elevation Tailwater Release Release Release
Date CS/CDT (ft-NGVD29) (ft-NGVD29) (cfs) (cfs) (cfs)
_____________________________________________________________________________________
07SEP2024 2100 391.72 371.42 0 0 0
07SEP2024 2200 391.38 371.45 0 0 0
07SEP2024 2300 391.40 371.22 0 0 0
07SEP2024 2400 391.51 371.65 0 0 0
08SEP2024 0100 391.47 371.53 0 0 0
08SEP2024 0200 391.41 371.45 0 0 0
08SEP2024 0300 391.46 371.39 0 0 0
08SEP2024 0400 391.52 371.62 0 0 0
08SEP2024 0500 391.50 371.59 0 0 0
08SEP2024 0600 391.44 371.49 0 0 0
08SEP2024 0700 391.50 371.48 0 0 0
08SEP2024 0800 391.49 371.45 0 0 0
08SEP2024 0900 391.51 371.57 0 0 0
08SEP2024 1000 391.46 371.62 0 0 0
08SEP2024 1100 391.52 371.48 0 0 0
08SEP2024 1200 391.38 371.84 9220 0 9220
08SEP2024 1300 391.47 372.01 10070 0 10070
08SEP2024 1400 391.63 371.94 9796 0 9796
08SEP2024 1500 391.56 371.83 10011 0 10011
08SEP2024 1600 391.49 371.86 10125 0 10125
08SEP2024 1700 391.52 371.97 10168 0 10168
08SEP2024 1800 391.54 372.23 10195 0 10195
08SEP2024 1900 391.62 371.74 0 0 0
08SEP2024 2000 391.72 371.53 0 0 0
08SEP2024 2100 391.50 371.36 0 0 0
08SEP2024 2200 391.47 371.57 0 0 0
08SEP2024 2300 391.65 371.59 0 0 0
08SEP2024 2400 391.65 371.83 0 0 0
09SEP2024 0100 391.51 371.64 0 0 0
09SEP2024 0200 391.56 371.46 0 0 0
09SEP2024 0300 391.64 371.60 0 0 0
09SEP2024 0400 391.59 371.65 0 0 0
09SEP2024 0500 391.53 371.69 0 0 0
09SEP2024 0600 391.61 371.62 0 0 0
09SEP2024 0700 391.61 371.53 0 0 0
09SEP2024 0800 391.56 371.60 0 0 0
7-Day Plot Data
Back to Arkansas River Projects
Back to Stream Gages